Sorry for the long break between the updates! I thought I had posted an update in October but just found the Oct. 8th post I wrote still marked "draft" in the system.

  • The bezel insert order has been submitted to the vendor. It took a little longer than we expected to get to verifying that the bezels fit okay on the cases. Mostly it was paperwork getting in the way. We will report back on the expected delivery date as soon as we know.
  • Case back engraving is currently in process and should be ready around the end of January 2016.
  • Second batch of date wheels have arrived and are awaiting QC.
  • Inspection of the dials and hands are ongoing.
  • Case preparation is ongoing.