Project 300 update

  • The updated designs came back from the case supplier. With the exception of the bracelet end-piece we have everything buttoned-up. If we have to we can go forward with the case sampling before the drawings on the bracelet are final but this isn't ideal. I hope, and expect, that next week that my tweaks to the end-piece are acceptable and that we can finally proceed with the sampling stage.
  • Hands: As noted earlier the hand designs have been released to the vendor. The order has been acknowledged but we are still waiting on the delivery time frame for the parts. Once received we will begin the process of inspection and having the parts lumed.
  • Case back design: Based on discussions about the survey data and comments we have finalized the case back design. Because we expect that there will be people that agree and disagree with the final decision I will post the details as soon as I can put together a post detailing our thinking and the reasons for our conclusion.
  • Assuming that we enter the pre-production sampling stage of the project this month we will be sending out requests for the 2nd stage payments to Plankowners. The first payments made by Plankowners were used to secure the movements for the project. The 2nd stage payments will be allocated to tooling and production deposits/costs.