I have completed the final review of the case drawings. There are a few minor issues we need to double check or correct before we can sign off on the drawings. These are minor things like tolerances and similar details. In the mean time I would like to see if we can nail down the case back engraving so that everything can be submitted at the same time. Toward that end:

  • We have 2 case back designs ready for review. One basic one and a second one with a design.
  • We will create two surveys: 1) for the Plankowners to voice their opinion and choose 2) a more general survey for everyone else. The reason for the 2 surveys is simple if there is any significant disagreement between the results Plankowners should have priority.
  • Everyone is welcome to discuss the design on our forum before voting but I probably will not be able to participate directly in the discussions given the current workload. For that I apologize in advance. We are trying to clear the deck of the design work that we do so that I can focus on managing the suppliers and executing the projects. I want to get the design work for both the Project 300 and Project GMT wrapped up in this regard by the end of August.
Project 300, General Newsadmin