2015-07-01: Project 300

I received the drawings for the last 3 parts I was waiting on. Unfortunately they were not received early enough for me to review before our annual pilgrimage to Taiwan to visit the in-laws (which begins in 12 hours from now). As long as these last three drawings don't have any issues I should be able to complete a final review of the drawings after I get back on the 20th of July. The goal is to sign-off on the drawings and begin sampling by the beginning of August. We have an idea for the case back design but again we will have to present this after our return.