Join Our Email List   |   facebookFacebook   |   Mk II forumMk II Forum

Lead times for pre-built updated

The lead times for the Paradive and the Sea Fighter have been revised down. The lead time for the Paradive is currently 4 weeks and the lead time for the Sea Fighter is currently 6 weeks.